Upstream events are incorrectly updated after a realign is performed on a route with a gap when the event behavior is set to Cover.
上次发布: November 20, 2019ArcGIS Roads and Highways
漏洞 ID 编号
BUG-000126823
已提交
November 18, 2019
上次修改时间
June 5, 2024
适用范围
ArcGIS Roads and Highways
找到的版本
10.7.1
操作系统
Windows OS
操作系统版本
10.0 64 Bit
状态
Known Limit
经开发团队审核,已确定此问题与不受 Esri 控制的软件的已知限制有关。 问题的“其他信息”部分可能包含进一步说明。
附加信息
When making consecutive edits on the same effective date, no record for the event with the same From and To dates are kept in the system. The result of the two consecutive edits is one record for before any edits take place and one record for after both edits take place. The record for after the first edit, but before the second edit, is deleted since it has the same From and To dates.