The declination date of a topographic north arrow is set to the default date of 1/1/2015 instead of the current date.
上次发布: May 23, 2018ArcGIS Pro
漏洞 ID 编号
BUG-000111335
已提交
February 1, 2018
上次修改时间
February 14, 2025
适用范围
ArcGIS Pro
找到的版本
2.1
操作系统
Windows OS
操作系统版本
7.0 64 Bit
状态
Will Not Be Addressed
开发团队已考虑过该问题或请求,并决定不会解决该问题。 问题的“其他信息”部分可能包含进一步说明。
附加信息
This is by design. The Topographic North Arrow (TM North Arrow) meets a mapping specification. The workaround is to do the following:
1. Right-click on the TM North Arrow and select Properties from the context menu. The Element pane is launched.
2. On the Element pane for Format North Arrow, uncheck Update Dynamically and choose the appropriate date.
At ArcGIS Pro 2.2 release, we will be releasing a Topo North Arrow. The Topo North Arrow when inserted will have a Declination Date of the day that it was inserted into the layout.
解决办法
Uncheck the Update Dynamically option and manually set the date.