In ArcGIS Survey123 Connect, when adding a constraint to a dateTime question, if only the date is selected (the time is blank), the constraint is not applied in the web form.
上次发布: October 15, 2021ArcGIS Survey123
漏洞 ID 编号
BUG-000142750
已提交
September 8, 2021
上次修改时间
June 5, 2024
适用范围
ArcGIS Survey123
找到的版本
3.12
操作系统
Windows OS
操作系统版本
10.0 64 Bit
状态
Will Not Be Addressed
开发团队已考虑过该问题或请求,并决定不会解决该问题。 问题的“其他信息”部分可能包含进一步说明。
附加信息
This is by design. Date and time are both required before the constraint starts to work.
解决办法
Populate the time in the dateTime question before submitting the form for the constraint to apply.
Set a default value to the dateTime question so it has both date and time populated.