经开发团队审核,已确定此问题与不受 Esri 控制的软件的已知限制有关。 问题的“其他信息”部分可能包含进一步说明。
附加信息
There are various reasons why scaled cost barriers don’t apply to turns (this was actually by design). However, there is a very simple solution to their problem. Essentially, it appears they want global turn delays everywhere *except at a few choice intersections where they know that there are crosswalks/traffic-signals*.
At those few choice intersections, they are currently willing to digitize barriers in an attempt to “scale down” the global-turn delays. A more appropriate solution would instead be to digitize explicit turns at those specific intersections, and directly assign them the desired (scaled-down) turn costs. Explicit turns always override global turns, so the global turns won’t be used at these intersections, but instead the explicit turns with the smaller desired costs will be used. This not only solves the problem, but will speed up their solves, as having to add in barriers slows things down considerably at solve time (barriers are really only intended to support ephemeral scenarios [e.g., temporary road closures or weather conditions], not permanent aspects of the network, such as this).