laptop and a wrench

Error

When a task with an attached tactical summary report is created and assigned in ArcGIS Mission Manager, the submitted report does not link to the originating task, resulting in a missing task ID in the report pop-up and an empty 'report_url' field in the task attributes.

ArcGIS Mission
Número de ID del error BUG-000180182
EnviadoOctober 14, 2025
Última modificaciónOctober 23, 2025
Relacionado conArcGIS Mission
Versión encontrada11.5
Sistema operativoWindows OS
Versión de sistema operativo11.0 64 bit
EstadoIn Product Plan

Información adicional

When a report is added to a task, the task and report have a loose association that is difficult to track. Their is a Task ID field in each report that is submitted along with a task, but it has a sequential numbering system where the task id field of the report is based on the order that the task it was assigned to falls in the queue. This can make it difficult to understand which report is related to which task.

Pasos para reproducir

ID del error: BUG-000180182

Software:

  • ArcGIS Mission

Recibir notificaciones cuando cambie el estado de un error

Descargar la aplicación de soporte de Esri

Descubrir más sobre este tema

Obtener ayuda de expertos en ArcGIS

Contactar con el soporte técnico

Descargar la aplicación de soporte de Esri

Ir a opciones de descarga